You guys should understand - the current section of the hole is only unstable because it has not been cased. It was left open so it could conduct tests.
The original section beyond 3,000 was unstable because it was left for too long. So ST1 was drilled.
But now, ST1 is unstable according to the company.
They can finish the job by drilling ST 2. And it would cost only an extra few millions.
But starting a new hole from the surface to 3,000 metres, requires months of planning and 2 months of drilling. It would cost circa $20m plus.
So its cost effective to finish the job at ST2 than to start M 2 (assuming gas contents coming out of the structure is excellent)?!?
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu 1 & Sidetrack Well Results Amendment
Ann: Mukuyu 1 & Sidetrack Well Results Amendment, page-165
-
-
- There are more pages in this discussion • 712 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
-0.002(2.53%) |
Mkt cap ! $110.9M |
Open | High | Low | Value | Volume |
8.1¢ | 8.1¢ | 7.6¢ | $98.3K | 1.263M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 56296 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 17264 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 56296 | 0.076 |
5 | 150167 | 0.075 |
2 | 227000 | 0.074 |
2 | 92000 | 0.073 |
2 | 76180 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 17264 | 1 |
0.078 | 100000 | 1 |
0.081 | 305220 | 2 |
0.082 | 505000 | 3 |
0.083 | 520000 | 3 |
Last trade - 16.10pm 07/08/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |