The failure to obtain a sample (in the sidetrack) is a technical issue.....hole conditions. You can probably also add in operational issues on the part of BH for failure to maintain two working formation test tools at all times but often this is an impossibility given resources at the well site. Trying to carry out tool repairs while they're logging at the same time can be a challenge.....I've been in this situation a few times even offshore with a much larger wireline crew than they'd have on Mukuyu.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu 1 & Sidetrack Well Results Amendment
Ann: Mukuyu 1 & Sidetrack Well Results Amendment, page-32
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
0.001(1.56%) |
Mkt cap ! $98.56M |
Open | High | Low | Value | Volume |
6.4¢ | 6.7¢ | 6.4¢ | $113.8K | 1.748M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 34000 | 6.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.6¢ | 120276 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 122585 | 0.064 |
3 | 216429 | 0.063 |
4 | 574487 | 0.062 |
5 | 808099 | 0.061 |
4 | 535000 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.066 | 95000 | 1 |
0.067 | 39888 | 1 |
0.068 | 118873 | 4 |
0.069 | 316700 | 3 |
0.070 | 230000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online