IVZ 1.14% 8.7¢ invictus energy ltd

Ann: Mukuyu 1 & Sidetrack Well Results Amendment, page-623

  1. 2,799 Posts.
    lightbulb Created with Sketch. 475
    A successful flow test from M2 will negate most of the current assumptions and discussions, but we do need something to talk about while we wait for results. wink.png

    Going back to M1 isn’t on the cards, this has been stated. As KG has said, what is the point of getting a third lot of the same data. Cost of around $3-4m. SM stated that $3-4m will pay for 3D seismic. Money better spent.

    It is the wet season now, maybe moving to Baobab on the flood plain, or anywhere else for that matter, is a problem that got solved with warm stacking the rig for repair and upgrade. The rig took longer to arrive than planned, and M1 took a lot longer to drill than anticipated. Just a thought.

    My guess is May/June for spud of M2. Pad needs to be constructed (4-6weeks) after the worst of the rains. Will depend on if the Wet season is longer or shorter.

    https://www.ventureco-worldwide.com/africa/zimbabwe/zimbabwe-seasons/

    Tubulars, maybe they do have enough casting Davy, maybe they need the production string.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
8.7¢
Change
-0.001(1.14%)
Mkt cap ! $123.3M
Open High Low Value Volume
8.9¢ 8.9¢ 8.4¢ $496.7K 5.718M

Buyers (Bids)

No. Vol. Price($)
2 10998 8.7¢
 

Sellers (Offers)

Price($) Vol. No.
8.9¢ 400000 1
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.