"Rig 202 will continue to drill ahead in the 12 ¼” inch intermediate hole section through the Dande and Forest targets to a planned total section depth of approximately 2,040m MD within the Pebbly Arkose formation before running a wireline logging evaluation suite and then setting the 9 ⅝” casing."
Does this mean we could see a fluid sample to surface based on the Dande/Forest targets? Or will fluid sampling come later?
- Forums
- ASX - By Stock
- Ann: Mukuyu-2 Drilling Update
"Rig 202 will continue to drill ahead in the 12 ¼” inch...
-
-
- There are more pages in this discussion • 282 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $107.6M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 90000 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 7367 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 90000 | 0.075 |
1 | 131715 | 0.072 |
1 | 13944 | 0.071 |
5 | 317045 | 0.070 |
2 | 86992 | 0.069 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 7367 | 1 |
0.072 | 543581 | 5 |
0.073 | 558900 | 5 |
0.074 | 254688 | 4 |
0.075 | 303333 | 3 |
Last trade - 07.17am 27/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
Day chart unavailable