"what sort of time frame to case this section and resume drilling? "
Announcement mentions Preparing to drill the 8-1/2" hole section. That implies that 9-5/8" casing has been run and cemented. Usually a new hole hole section begins at that point for reporting purposes.
Forward operations:
- BOP test
- Run in hole with drilling assembly
- drill out casing shoe
- Perform leak off (test taken all the way to the point where fracturing starts) or Formation Integrity test (test taken to a set frac pressure) to establish frac gradient for next hole section. This is a critical step as it dictates how far we can drill with the 8-1/2" hole section.
- drill ahead 8-1/2" hole to TD.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 Drilling Update
Ann: Mukuyu-2 Drilling Update, page-120
-
-
- There are more pages in this discussion • 869 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.8¢ |
Change
-0.003(3.70%) |
Mkt cap ! $110.5M |
Open | High | Low | Value | Volume |
8.0¢ | 8.1¢ | 7.7¢ | $151.9K | 1.932M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 237927 | 7.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.9¢ | 255554 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 237927 | 0.078 |
3 | 54727 | 0.077 |
4 | 255657 | 0.076 |
4 | 153333 | 0.075 |
4 | 427202 | 0.074 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 255554 | 4 |
0.080 | 50000 | 1 |
0.081 | 343873 | 1 |
0.082 | 200000 | 1 |
0.083 | 80000 | 1 |
Last trade - 16.10pm 23/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & MD
Charles Armstrong
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online