IVZ 2.41% 8.1¢ invictus energy ltd

Ann: Mukuyu-2 Drilling Update, page-120

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "what sort of time frame to case this section and resume drilling? "

    Announcement mentions Preparing to drill the 8-1/2" hole section. That implies that 9-5/8" casing has been run and cemented. Usually a new hole hole section begins at that point for reporting purposes.

    Forward operations:

    - BOP test
    - Run in hole with drilling assembly
    - drill out casing shoe
    - Perform leak off (test taken all the way to the point where fracturing starts) or Formation Integrity test (test taken to a set frac pressure) to establish frac gradient for next hole section. This is a critical step as it dictates how far we can drill with the 8-1/2" hole section.
    - drill ahead 8-1/2" hole to TD.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
8.1¢
Change
-0.002(2.41%)
Mkt cap ! $116.6M
Open High Low Value Volume
8.3¢ 8.4¢ 7.9¢ $127.3K 1.571M

Buyers (Bids)

No. Vol. Price($)
1 1197 8.1¢
 

Sellers (Offers)

Price($) Vol. No.
8.2¢ 56621 4
View Market Depth
Last trade - 16.10pm 26/08/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.