IVZ 0.00% 6.8¢ invictus energy ltd

"So as someone hinted, is drill to TD first and then sample from...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "So as someone hinted, is drill to TD first and then sample from bottom to top?"

    Yes but any sampling would be done at end of each hole section (ue 12-1/4" and 8-1/2" hs).

    Mention of increased background gas but no mention of LWD resistivity anomalies or log pay based on wireline data in the 12-1/4" h.s. Also mention of the MDT being run. Based on this I'm assuming no moveable hydrocarbons within the section.


 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.