Separate tests of oil bearing layers "from" rich gas condensate layers was meant to be written as "separately from" or versus. In total, possibly about 4 or 5 flow tests in the Upper Angwa and one in the Lower Angwa. As it is gas, they may well decide to perform modified isochronal tests (MIT) in the lower perm to moderate perm intervals to evaluate well deliverability.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-1043
-
- There are more pages in this discussion • 1,282 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
0.001(1.25%) |
Mkt cap ! $116.6M |
Open | High | Low | Value | Volume |
8.1¢ | 8.1¢ | 7.9¢ | $50.04K | 625.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 239133 | 7.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 239133 | 0.079 |
5 | 116605 | 0.078 |
3 | 212467 | 0.077 |
1 | 263157 | 0.076 |
4 | 330066 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 100000 | 1 |
0.081 | 485201 | 2 |
0.082 | 370000 | 3 |
0.083 | 500000 | 3 |
0.084 | 445625 | 5 |
Last trade - 15.38pm 16/08/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |