Hole sections need to be wireline logged before they are cased. 7" liner can't be run over the current open hole section until MDT operations are completed and side wall coring tool is run. VSP shoot may get done through 7" liner or at 6" TD if they deepen the well.
The normal sequence is to drill successively smaller diameter hole sections, wireline log them and then case them off before drilling next hole section.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-1288
-
-
- There are more pages in this discussion • 1,037 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
0.003(4.05%) |
Mkt cap ! $116.7M |
Open | High | Low | Value | Volume |
7.6¢ | 7.7¢ | 7.5¢ | $36.27K | 480.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 113950 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 123586 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 113950 | 0.075 |
1 | 130000 | 0.074 |
3 | 84432 | 0.072 |
3 | 89050 | 0.071 |
6 | 883942 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 123586 | 3 |
0.078 | 265267 | 2 |
0.079 | 120000 | 1 |
0.080 | 94368 | 4 |
0.081 | 1677 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |