IVZ 4.05% 7.7¢ invictus energy ltd

Ann: Mukuyu-2 fluid sampling progress update, page-1288

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    Hole sections need to be wireline logged before they are cased. 7" liner can't be run over the current open hole section until MDT operations are completed and side wall coring tool is run. VSP shoot may get done through 7" liner or at 6" TD if they deepen the well.

    The normal sequence is to drill successively smaller diameter hole sections, wireline log them and then case them off before drilling next hole section.
    Last edited by Kiwigeo8339: 16/11/23
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.