"I was under the impression that this process, once initiated can take merely 24 hours"
-TLC operations are slow.
- Take time for a bit trip and add in a few extra hours for slower pipe speed while tripping with wireline cable attached to the tool. 10- 12 hours normal two way trip time plus extra
- Add in logging time. Again take normal time you'd take to run the tool on wireline and add on a whole lot of extra time to allow for the fact you're tripping pipe every time you move the tool.
If they've already acquired pressures then a sampling only (say 12 stations) run on TLC would take a minimum of 1-1/2 days...more likely 2 days.
If the have to acquire pressures then add on more time for that.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-168
-
-
- There are more pages in this discussion • 2,157 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
-0.002(2.99%) |
Mkt cap ! $101.6M |
Open | High | Low | Value | Volume |
6.6¢ | 6.6¢ | 6.5¢ | $2.142K | 32.49K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 255984 | 6.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.6¢ | 40837 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 255984 | 0.065 |
2 | 194792 | 0.064 |
6 | 456857 | 0.063 |
3 | 479487 | 0.062 |
4 | 800099 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.066 | 40837 | 2 |
0.067 | 122123 | 3 |
0.068 | 247728 | 4 |
0.069 | 11700 | 1 |
0.070 | 15384 | 1 |
Last trade - 11.26am 06/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |