"Checked" refers to checking that a module is operational when inserted in the tool string.
Tools under go full and rigorous testing in the base prior to load out. For some modules this will include things like a soak test in an oven.
Once tools reach the rig they are set up on the ground as they'll be run and plugged into the wireline unit for testing. The Engineer will check that he can communicate with the tools and that any commands sent from the unit trigger the correct operations on the tool. If applicable a field calibration of the tools is also carried out. These checks are done on both primary and backup tool sets.
Immediately prior to running in the hole with the tools a further function check will be performed on the tools. In the case of the MDT this will include cycling the probe.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-458
-
-
- There are more pages in this discussion • 1,867 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
-0.003(4.05%) |
Mkt cap ! $107.6M |
Open | High | Low | Value | Volume |
7.5¢ | 7.5¢ | 7.1¢ | $46.18K | 642.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 164923 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 150000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 164923 | 0.071 |
7 | 349914 | 0.070 |
3 | 536268 | 0.069 |
4 | 349117 | 0.068 |
5 | 314984 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 150000 | 1 |
0.075 | 244808 | 1 |
0.076 | 604216 | 3 |
0.077 | 590022 | 8 |
0.078 | 648125 | 7 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online