IVZ 4.23% 7.4¢ invictus energy ltd

Ann: Mukuyu-2 fluid sampling progress update, page-642

  1. 1,604 Posts.
    lightbulb Created with Sketch. 655
    Petere said the hole has been open for two weeks,

    I should have clarified since TD....

    When new hole is drilled, there is an initial "spurt" loss into the formation before a filter cake is built up, after which fluid loss is controlled by the filter cake. In cases where there are fractures and/or high permeability streaks where the mud properties don't allow a filter cake to build (loss circulation), LCM materials are required to slow down the fluid loss to allow a filter cake to build.

    FILTRATION, WALL BUILDING, AND RESISTIVITY OF DRLLING FLUID Drilling Fluid Management & Disposal

 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.