On wireline you'd normally acquire pressures first working down and then take samples coming back out. If youre running TLC you might change that plan to minimize movement of the drill pipe or for other reasons.
Its possible enough pressures (minimum of 3 generally) were taken to enable confirmation of a gas gradient and also to select a sample point with decent mobility.
Hard to ascertain what pressures have been acquired with the available data.
- Forums
- ASX - By Stock
- Ann: Mukuyu-2 fluid sampling progress update
On wireline you'd normally acquire pressures first working down...
-
- There are more pages in this discussion • 1,857 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.002(2.94%) |
Mkt cap ! $99.25M |
Open | High | Low | Value | Volume |
6.9¢ | 7.0¢ | 6.8¢ | $104.1K | 1.514M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 191400 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 426161 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 171400 | 0.068 |
6 | 244573 | 0.067 |
7 | 322500 | 0.066 |
7 | 322254 | 0.065 |
4 | 473890 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 426161 | 6 |
0.071 | 387480 | 2 |
0.072 | 452120 | 7 |
0.073 | 140000 | 1 |
0.074 | 200000 | 1 |
Last trade - 16.10pm 10/05/2024 (20 minute delay) ? |
|
|||||
Last
6.9¢ |
  |
Change
0.002 ( 1.47 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 7.0¢ | 6.8¢ | 458792 | ||
Last updated 15.46pm 10/05/2024 ? |
Featured News
IVZ (ASX) Chart |