IVZ 1.49% 6.8¢ invictus energy ltd

Ann: Mukuyu-2 sidetrack drilling successfully commenced, page-115

  1. 1,529 Posts.
    lightbulb Created with Sketch. 1583

    Nice update, all looks to be on track. I guess maybe a week to reach TD and start the wireline program. Objective 1 for me now will be to make sure to get the liner set in place so that we can go deeper and flow back this well early next year. Getting a sample now I don't care about anymore... the logs already run tell us what we have in place and we will need to flow test to know the dynamic behaviour of the reservoirs anyway. So some small bottles of fluid up now or fill some tanks at surface next year - either way works. We need to be able leave this well in a position to drill deeper and flow test from multiple reservoirs at end Q1 2024.

    Someone put me to sleep through the next 4 months and wake me up when we flow test and light the flare for the overpressured gas bearing Lower A reservoirs...

    ...what has 4 legs, 2 tusks and a trunk?
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.