It depends on the severity of the dog leg at the kick off point and whether sidetrack was kicked off on high side or low side of the original bore.
During any trips in and out of the hole there shouldn't be any issues. If any significant reaming is required the DD will usually take a few check surveys to confirm a second sidetrack hasnt been initiated on low side of the hole while reaming.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 sidetrack drilling successfully commenced
Ann: Mukuyu-2 sidetrack drilling successfully commenced, page-34
-
-
- There are more pages in this discussion • 185 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
-0.003(3.70%) |
Mkt cap ! $112.3M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 7.8¢ | $83.25K | 1.053M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 106550 | 7.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 132215 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 106550 | 0.078 |
4 | 147000 | 0.077 |
1 | 263157 | 0.076 |
5 | 260566 | 0.075 |
1 | 200000 | 0.074 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 132215 | 2 |
0.081 | 780000 | 6 |
0.082 | 795000 | 5 |
0.083 | 120000 | 2 |
0.084 | 15625 | 1 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |