Just out of curiosity, what is the meaning/implication of the bolded portion of the following excerpt from the news release:
"Since the last update, the Mukuyu-2 well was plugged back with cement above the 9⅝” casing shoe (atapproximately 1,966m Measured Depth (mMD) and drilling to kickoff the Mukuyu-2 ST1 (sidetrack) wellwas initiated and successfully achieved with 100% new formation drilled."
Was this included to indicate that the drill bit did not follow the original wellbore but rather immediately kicked off into the new borehole? For example, if the number had been 80%, would that mean that the drillbit drilled out the concrete fill of the original borehole for a little ways before it successfully started drilling the new borehole?
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 sidetrack drilling successfully commenced
Ann: Mukuyu-2 sidetrack drilling successfully commenced, page-52
-
-
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.0¢ |
Change
0.002(2.94%) |
Mkt cap ! $99.25M |
Open | High | Low | Value | Volume |
6.9¢ | 7.0¢ | 6.7¢ | $101.9K | 1.487M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 354854 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.069 |
5 | 240973 | 0.068 |
5 | 887635 | 0.067 |
7 | 248441 | 0.066 |
6 | 286432 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 354854 | 3 |
0.071 | 5417 | 1 |
0.073 | 325000 | 2 |
0.074 | 200000 | 2 |
0.075 | 737400 | 5 |
Last trade - 16.10pm 15/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online