"Does the tool stay in the hole for the entirety of the pressures/fluid sampling, SWC, and VSP? Or does the MDT get pulled out of the hole after fluid samples, samples retrieved, then back in for the last run(s)? "
A completely different tool string is in the hole for each run. The MDT tool would ideally stay in the hole for the pressure survey as well as sampling operations. On rare occasions I've broken an MDT run into separate pressure survey and sampling runs but that was for unusual reasons.
Sidewall cores are cut using a rotary coring tool and during the VSP a string of shuttles (geophones) are run on the wireline and set at successive stations up the hole starting at TD while firing off an air gun at surface while shuttles are set at each station.
- Forums
- ASX - By Stock
- Ann: Mukuyu-2 Wireline Logging Progress Update
"Does the tool stay in the hole for the entirety of the...
-
-
- There are more pages in this discussion • 320 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
8.7¢ |
Change
-0.001(1.14%) |
Mkt cap ! $123.3M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.4¢ | $496.7K | 5.718M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 8.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 400000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 0.087 |
1 | 100000 | 0.086 |
1 | 14457 | 0.085 |
8 | 364119 | 0.084 |
4 | 383830 | 0.083 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 400000 | 1 |
0.090 | 250000 | 1 |
0.091 | 315000 | 2 |
0.092 | 325000 | 2 |
0.093 | 360000 | 5 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online