On M-1 the mud chemistry wasn't right. Clays in shales were swelling causing shales to slough into wellbore i.e. hole deterioration. That's has been fixed in M-2, but the MDT with sample chambers fills most of an 8.5" hole, so the longer you spend taking samples the higher the risk of getting stuck. Conveying the tool on drill pipe (TLC) means the MDT can be freed more easily.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 wireline logging progress update
Ann: Mukuyu-2 wireline logging progress update, page-138
- There are more pages in this discussion • 549 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.002(2.90%) |
Mkt cap ! $94.99M |
Open | High | Low | Value | Volume |
6.8¢ | 7.0¢ | 6.7¢ | $101.4K | 1.486M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 506473 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.8¢ | 34903 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 506473 | 0.067 |
8 | 347109 | 0.066 |
7 | 310406 | 0.065 |
3 | 448890 | 0.064 |
1 | 1 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 34903 | 2 |
0.069 | 391144 | 3 |
0.070 | 386548 | 4 |
0.072 | 17354 | 2 |
0.073 | 1100000 | 3 |
Last trade - 16.10pm 28/05/2024 (20 minute delay) ? |
|
|||||
Last
6.8¢ |
  |
Change
-0.002 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 7.0¢ | 6.8¢ | 731422 | ||
Last updated 14.42pm 28/05/2024 ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online