On M-1 the mud chemistry wasn't right. Clays in shales were swelling causing shales to slough into wellbore i.e. hole deterioration. That's has been fixed in M-2, but the MDT with sample chambers fills most of an 8.5" hole, so the longer you spend taking samples the higher the risk of getting stuck. Conveying the tool on drill pipe (TLC) means the MDT can be freed more easily.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 wireline logging progress update
Ann: Mukuyu-2 wireline logging progress update, page-138
- There are more pages in this discussion • 549 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.001(1.45%) |
Mkt cap ! $99.25M |
Open | High | Low | Value | Volume |
6.9¢ | 7.1¢ | 6.8¢ | $153.3K | 2.193M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 74962 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 218454 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 74962 | 0.070 |
1 | 25000 | 0.069 |
4 | 104556 | 0.068 |
5 | 899000 | 0.067 |
7 | 221277 | 0.066 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 218454 | 5 |
0.073 | 140000 | 1 |
0.074 | 204000 | 3 |
0.075 | 45738 | 3 |
0.076 | 383000 | 3 |
Last trade - 16.10pm 14/05/2024 (20 minute delay) ? |
|
|||||
Last
7.0¢ |
  |
Change
0.001 ( 4.48 %) |
|||
Open | High | Low | Volume | ||
6.9¢ | 7.2¢ | 6.7¢ | 1291183 | ||
Last updated 15.59pm 14/05/2024 ? |
Featured News
IVZ (ASX) Chart |