Horse hill was drilled in 2014,it is now 2019 and ukog are still waiting for scc to actually hold a meeting on the planning for production,its probably why the horizontals have not been drilled,got to have a production licence has not much point in drilling the thing as there is no guarantee they will be allowed to produce is there
And none of that is DL's fault
- Forums
- ASX - By Stock
- Ann: Multi TCF Butler prospect proposed drilling location
Horse hill was drilled in 2014,it is now 2019 and ukog are still...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DOR (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.692M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DOR (ASX) Chart |
Day chart unavailable