VC07 east looks like its getting better and better, nice long and shallow interceptions, its still open in all directions and they're expanding the drill program again which is great news.
However they mention 5 holes were finished for Vc07 West and then don't comment further on them at all, but spend lots of time explaining how good the east was going and pXRF says they all had high grade results, do we assume West is proving more problematic and they missed with all 5?
Table 1 has all the intercept lengths for VC east but nothing for West. which could be concerning, however they also state that VC7 east drill out was nearly complete and then would move the 3 rigs that are drilling east to the West to complete drill out there. Assuming 1 rig is already drilling west that's 4 rigs drilling the west in the next month or two. If west was a bust they wouldn't put 4 drill rigs on it.
Also confirmed heritage approval is a way off for VC 18 unfortunately.