Well VSR started drilling on 24.04.23
Then 3 weeks later only 15 drill holes, they only showed 4 chip trays, diagrams from 4 holes drilled at depths of at the most 45m-80m, so basically really easy to report photos and diagrams, RR1 are still drilling Phase 1 and still have another 5 days of drilling to go.
RR1 have drilled more holes (34) at deeper depths which take much longer than VSR phase 1 Drilling of only 15 holes at depths of 45m-80m
By the way RR1 has drilled 34 holes in that amount of time so more work and more samples to log and deal with, Im sure RR1 after Phase 1 drilling is over will update the market sometime in mid September.
- Forums
- ASX - By Stock
- Ann: Multiple Thick, Stacked Pegmatites Intersected at Morrissey
Well VSR started drilling on 24.04.23Then 3 weeks later only 15...
- There are more pages in this discussion • 140 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $10.49M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.2¢ | $12.86K | 1.071M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1275450 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 520257 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 1347307 | 0.011 |
3 | 1176540 | 0.010 |
6 | 1413330 | 0.009 |
7 | 8279570 | 0.008 |
8 | 4298566 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 520257 | 4 |
0.013 | 584596 | 4 |
0.014 | 284667 | 2 |
0.015 | 2082287 | 5 |
0.016 | 4500000 | 1 |
Last trade - 12.46pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
1.1¢ |
  |
Change
-0.001 ( 15.4 %) |
|||
Open | High | Low | Volume | ||
1.2¢ | 1.2¢ | 1.1¢ | 1049471 | ||
Last updated 15.07pm 15/05/2024 ? |
Featured News
RR1 (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online