Forward ProgrammesThe remaining planned drilling is centred on completion of the programme at the Kikagati deposit including hole KKDD009, currently in progress, for a proposed 300m. This hole is located on the northern most cross section and will provide the uppermost demonstration of down dip and northern most along strike potential.Initial assays results are expected from drill holes KKDD001 – KKDD006 in the coming few weeks with samples for KKDD007-009 anticipated to be submitted to the laboratory by the end of March.
How long does it take to get results? And should the drilling be completed by now (was currently in progress 13/03)?
- Forums
- ASX - By Stock
- Ann: Multiple visible cassiterite occurrences in drilling
Forward ProgrammesThe remaining planned drilling is centred on...
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $17.11M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $16.95K | 3.333M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 6316950 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 26036993 | 34 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 6316950 | 0.005 |
39 | 36193746 | 0.004 |
15 | 15243329 | 0.003 |
17 | 24417925 | 0.002 |
17 | 40661747 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 26036993 | 34 |
0.007 | 8963139 | 16 |
0.008 | 8732160 | 14 |
0.009 | 9527477 | 8 |
0.010 | 4106511 | 8 |
Last trade - 14.57pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
0.5¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.5¢ | 0.5¢ | 0.5¢ | 3300000 | ||
Last updated 15.28pm 16/05/2024 ? |
Featured News
CAV (ASX) Chart |