I was early on PMET on the TSX (around 70c's). When it started getting attention around the $3 CAD mark, continual questions were being asked about the lake draining. It reached $2bn max.
If the 80m and 100m peg hits are mineralised, the potential tonnage here is quite substantial, especially based on multiple pegmatites and old mines.
First nations discussions will continue to be discussed, just like at PMET with the lake draining. Won't stop this reaching $1bn IF the drills keep hitting.
- Forums
- ASX - By Stock
- Ann: Multiple Wide, High-Grade and Shallow Lithium Intersections
I was early on PMET on the TSX (around 70c's). When it started...
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $45.33M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 34.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 10585 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 0.340 |
1 | 20000 | 0.330 |
1 | 30001 | 0.325 |
1 | 320 | 0.315 |
1 | 25000 | 0.310 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 10585 | 3 |
0.360 | 32076 | 3 |
0.370 | 65998 | 2 |
0.375 | 2666 | 1 |
0.385 | 25515 | 2 |
Last trade - 12.36pm 15/05/2024 (20 minute delay) ? |
Featured News
IR1 (ASX) Chart |
Day chart unavailable
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online