    " Highlights
    Strategic Review has focused on near term cash flow options
    Plant upgrade to generate a low-cost process route underway
    Processing of mullock to be completed on site
    3D Resources Limited (ASXDD) (3D Resources or the Company) is pleased to provide the following
    update as it moves to finalise its strategic review at the Adelong Gold Project situated in Southern
    NSW targeting near term gold production.
    Managing Director of 3D Resources, Mr. Peter Mitchell, commented:
    “We continue to approach the Adelong Gold Project as a near term commercial opportunity
    to take advantage of the prevailing gold price and the current status as a mine that has been
    approved for development and production.
    Various options for developing the mine and processing plant have been considered and the
    finalisation of these plans continues with a site meeting of 7 engineers completed this week.
    In assessing the Company’s plans, it is important to recognise that the current resources
    could potentially provide 15 years life of operations at the approved mining rate.”
    Plant Upgrade
    Extensive prior metallurgical test work that had been carried out on Adelong has lead the company
    to proceed with additional test work that focused on recovering the vast majority of the gold in a
    gravity concentrate from a coarsely ground sample of Adelong Ore. The results of tests on a -1mm
    grind size to date have proven to be excellent and while this program of testing continues to the
    second stage grind, it is clear from the work done so far that the vast majority of the gold can be
    recovered as a viable concentrate from low cost spirals.
    There are several key benefits in adopting this approach:
    • Reduction of grinding requirements which improves mill throughput. The Company now
    plans to install a two stage grinding circuit with a new rod mill designed to grind to 80%
    passing -1mm and use the existing ball mill to grind the -1mm tails from the initial spiral
    recovery to -350µ for a second stage spiral recovery process. These changes to the
    Adelong circuit are expected to lift milled ore delivery to the plant from 6t/hr to 35t/hr.
    A third stage crusher is also being considered to assist in this increased capacity.
    ASX Announcement
    10 December 2020
    www.3dresources.com.au
    • Generation of a low-cost process route that can be operated simply by the local
    workforce. A video of recent tests has been uploaded on the Company’s website
    (CLICK HERE - https://bit.ly/3lZPirf) that shows the clean separation of pyrite/gold from
    waste using gravity in the -1mm fraction of Adelong Ores.
    • Adoption of a coarser grind also assists in waste disposal as the majority of the waste
    will take the form of sand that can be stacked not requiring a tailings dam. This material
    can potentially be sold as a building product as the spiral process requires no chemicals
    that may contaminate this waste product.
    Processing of Mullock on site
    Following the acquisition of the Adelong gold project, the Company undertook a review of an
    existing scoping study completed by the former owner to treat the Mullock and/or Underground Ore
    from Adelong at a third party cyanide processing plant which was unused at the time. While the
    original studies had shown this to be commercial, investigation of other options determined the
    opportunity was not the preferred one.
    Concurrent work had progressed on the processing options for the upgraded Adelong Plant. The
    move away from the use of flotation as the primary method of recovering the gold, towards a low
    cost gravity processes that can potentially work well in recovering gold from the Adelong Mullock
    material has transformed the potential economics such that the Company now intends to
    commission the plant and start production using material from these Mullock dumps, potentially
    increasing the profitability substantially
    Last edited by bevter: 10/12/20
 
watchlist Created with Sketch. Add ADG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $4.471M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $25.53K 6.394M

Buyers (Bids)

No. Vol. Price($)
40 33313061 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2371470 4
View Market Depth
Last trade - 15.44pm 16/08/2024 (20 minute delay) ?
ADG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.