The Company will work with its technical consultants and the EPA to revise the draft
DPEMP with requested additional details and clarifications on the
proposed mining operation and the management measures.
glall
- Forums
- ASX - By Stock
- Ann: Nelson Bay River Iron Project Update
The Company will work with its technical consultants and the EPA...
-
- There are more pages in this discussion • 115 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.715M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $615 | 205K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 5801633 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 4695513 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 5801633 | 0.003 |
14 | 12663675 | 0.002 |
13 | 14972610 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 4695513 | 8 |
0.005 | 6522760 | 14 |
0.006 | 2582000 | 6 |
0.007 | 1422100 | 3 |
0.008 | 913756 | 2 |
Last trade - 10.02am 26/04/2024 (20 minute delay) ? |
|
|||||
Last
0.3¢ |
  |
Change
0.000 ( 14.3 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.3¢ | 0.3¢ | 1200000 | ||
Last updated 15.11pm 26/04/2024 ? |
Featured News
CTN (ASX) Chart |