Really solid report .
The transition from mainly gas to mainly oil took around 2 years in G1 and only 9 days in G6 .
G6 flow rate still increasing but for both G1 and G6 we need to wait a while to see how the wells perform in the longer term .
My hope for 200 to 400 bopd initial peak production when the oil hits the perforations looks a good bet to be exceeded.
What a gutsy decision to drill the sidetrack .
It turned out well after the first penetration only found non economic reservoir .
Gives me faith they are unravelling the geology of this complex three dimensional structure .
Really solid report .The transition from mainly gas to mainly...
Add to My Watchlist
What is My Watchlist?