Here's a timeline of the phase 1 drilling where 66 holes were drilled for a total of 2,755 metres you can find all this info on pg 2 of the Oct 8th discovery announcement.
Drilling begins 3rd Sep
Drilling finishes 15th Sep
Results announced 8th October (approx 3 weeks in the lab)
Phase 2 drilling
Drilling begins 5th November
Drilling finishes 30th November ( 5,961 metres drilled)
Final samples sent to lab on 30th November from 1st Dec ASX release (so if same time frame as phase 1 would give an estimated time of around 21-22nd Dec)
Not long to go now
Good luck everyone!
- Forums
- ASX - By Stock
- GIB
- Ann: Neta Lodes Target for Drilling
Ann: Neta Lodes Target for Drilling, page-169
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GIB (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.3¢ |
Change
-0.005(10.4%) |
Mkt cap ! $9.095M |
Open | High | Low | Value | Volume |
4.6¢ | 4.6¢ | 4.3¢ | $5.58K | 129.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 99436 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 35327 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 99436 | 0.040 |
2 | 68286 | 0.035 |
1 | 200000 | 0.031 |
2 | 120000 | 0.030 |
2 | 219000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 35327 | 1 |
0.046 | 110958 | 1 |
0.047 | 167732 | 1 |
0.048 | 166697 | 2 |
0.050 | 504002 | 3 |
Last trade - 14.05pm 07/06/2024 (20 minute delay) ? |
|
|||||
Last
4.3¢ |
  |
Change
-0.005 ( 4.44 %) |
|||
Open | High | Low | Volume | ||
4.3¢ | 4.3¢ | 4.3¢ | 34934 | ||
Last updated 14.05pm 07/06/2024 ? |
Featured News
GIB (ASX) Chart |