GIB 11.1% 4.0¢ gibb river diamonds limited

Here's a timeline of the phase 1 drilling where 66 holes were...

  1. 7,708 Posts.
    lightbulb Created with Sketch. 563
    Here's a timeline of the phase 1 drilling where 66 holes were drilled for a total of 2,755 metres you can find all this info on pg 2 of the Oct 8th discovery announcement.

    Drilling begins 3rd Sep
    Drilling finishes 15th Sep

    Results announced 8th October (approx 3 weeks in the lab)

    Phase 2 drilling

    Drilling begins 5th November
    Drilling finishes 30th November ( 5,961 metres drilled)

    Final samples sent to lab on 30th November from 1st Dec ASX release (so if same time frame as phase 1 would give an estimated time of around 21-22nd Dec)

    Not long to go now

    Good luck everyone!
    Last edited by prowiz: 18/12/20
 
watchlist Created with Sketch. Add GIB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.