HAV 4.76% 20.0¢ havilah resources limited

Ann: New Copper Mineralisation at Kalkaroo , page-2

  1. 3,445 Posts.
    lightbulb Created with Sketch. 1044
    The results from the assays prove HAV Management's theory that the Kalkaroo resource is open down dip.

    My calculations indicate that KKDD406 (upper part) has significantly higher grades (approx 1.76% Cu equivalent) compared to the main deposit of 0.79% Cu equivalent; whereas KKDD404 has 28% less grading than the main deposit.

    The only disappointment for me from KKDD406 (upper part) was the fact that it was only 13m.

    I still believe KKDD411 and KKDD 412, as they are closer to the West Kalkaroo zone on the map in today’s ASX release, will have assays higher than 0.7% copper grades and gold grades approaching 1.5 g/t.

    Remember, for the Kalkaroo JORC copper-gold resource a 0.3% Cu equivalent lower cut-off grade is applied (Source: cut-off parameters, Kalkaroo “Estimating and Reporting of Mineral Resources” on HAV website.)

    I hope the following analysis helps (someone please check my calculations).

    KKDD401 (58m interval averaging 0.48% Cu and 0.45 g/t Au from 291m depth)

    0.48% Cu = A$37 per tonne
    0.45 g/t = 0.015873 oz/t = A$25.4 per tonne
    A$62.4 per tonne (0.81% Cu equivalent)
    Based on an SG of 2.68, one cubic metre would be valued at A$167 (3.1% better grading than the main deposit)
    Therefore, 58 cubic metres would be valued at A$9,699
    KKDD406 (the upper part of hole only, 13m of mineralisation averaging 0.99% Cu and 1.05 g/t Au from 198m down hole)

    0.99% Cu = A$76.2 per tonne
    1.05 g/t = 0.037037 oz/t = A$59.3 per tonne
    A$135.5 per tonne (1.76% Cu equivalent)
    Based on an SG of 2.68, one cubic metre would be valued at A$363 (significantly better grading than the main deposit)
    Therefore, 13 cubic metres would be valued at A$4,719
    KKDD404 ( 33m of 0.37% copper and 0.27 grams per tonne of gold from 365m downhole)

    0.37% Cu = A$28.5 per tonne
    0.27 g/t = 0.009523 oz/t = A$15.2 per tonne
    A$43.7 per tonne (0.56% Cu equivalent)
    Based on an SG of 2.68, one cubic metre would be valued at A$117 (28% less grading than the main deposit)
    Therefore, 33 cubic metres would be valued at A$3,861


    Main Kalkaroo Project Deposit (124.5 Mt 0.50% Cu and 0.39 g/t Au)

    0.50% Cu = A$38.5 per tonne
    0.39 g/t = 0.013756 oz/t = A$22.0 per tonne
    A$60.5 per tonne (0.79% Cu equivalent)

    Assumptions:
    Based on copper price of A$7,700 per tonne
    Based on gold price of A$1,600 an oz
    Based on chalcopyrite (per HAV website) of SG 2.68, therefore there are 2.68 tonnes per cubic metre.
    Excludes any value for Mo and Co.

    Cheers
 
watchlist Created with Sketch. Add HAV (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.010(4.76%)
Mkt cap ! $66.49M
Open High Low Value Volume
21.0¢ 21.0¢ 20.0¢ $23.72K 117.6K

Buyers (Bids)

No. Vol. Price($)
3 170067 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 51381 2
View Market Depth
Last trade - 12.17pm 23/07/2024 (20 minute delay) ?
HAV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.