AS2 2.08% 4.7¢ askari metals limited

Ann: New Corridor of Interest Discovered at Uis Lithium Project, page-2

  1. 1,913 Posts.
    lightbulb Created with Sketch. 1199
    sounds & looks like paydirt:

    "It is also notable that Andrada’s Uis Mine (81 Mt @ 0.73% Li2O, 0.15% Sn and 86ppm Ta) and Spodumene Hill B1/C1 Project both fall along strike and within this highly prospective zone. Recent drilling results from Andrada Mining Ltd at the Spodumene Hill Project has defined shallow high-grade lithium mineralisation, including 14.52m at 1.38% Li2O, 285 ppm Ta and 0.131% Sn from a depth of 15.48m, including 5m at 2.32% Li2O from 18m and 2.5m at 2.04% Li2O from 25.5m."

    https://hotcopper.com.au/data/attachments/5440/5440103-778889e69b6be9fd50cd64a50bf7e6be.jpg

    hopefully our patience is rewarded!
 
watchlist Created with Sketch. Add AS2 (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
-0.001(2.08%)
Mkt cap ! $4.591M
Open High Low Value Volume
4.8¢ 4.8¢ 4.4¢ $7.609K 163.0K

Buyers (Bids)

No. Vol. Price($)
1 3000 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 64213 2
View Market Depth
Last trade - 15.42pm 24/06/2024 (20 minute delay) ?
AS2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.