So there looks to be approx. 800m between RBE-23-005 and RBE-23-009 so the potential mineralised length is good.
Not having RBE-23-006 or RBE-23-023 yet does make it harder to figure out what's happening but its a stacked system of some sort as RBE-23-008 and RBE-23-009 have two reported intercepts.
The lower one is interesting. The drilling angles were 43-47 degrees so they are nearer to surface than the down-hole length's suggest.
- RBE-23-007 intersected 23.3m (197-220m) at 1.16% (47% angle)
- RBE-23-008 intersected 10.5m (225-235.5m) at 1.08% (43% angle)
- RBE-23-009 intersected 11.7m (216.3m to 228m) at 1.12% (44% angle)
- This could be the same pegmatite with a comparatively flat east/west slope. If so its got a 400m length
![]()
- Forums
- ASX - By Stock
- Ann: New Discovery 1.3km East of Root Bay Deposit
GT1
green technology metals limited
Add to My Watchlist
3.33%
!
2.9¢

So there looks to be approx. 800m between RBE-23-005 and...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
2.9¢ |
Change
-0.001(3.33%) |
Mkt cap ! $13.77M |
Open | High | Low | Value | Volume |
3.0¢ | 3.1¢ | 2.9¢ | $9.834K | 336.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 68035 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 40274 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 68035 | 0.028 |
2 | 131111 | 0.027 |
5 | 92768 | 0.026 |
5 | 401472 | 0.025 |
1 | 500000 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 40274 | 1 |
0.030 | 137306 | 1 |
0.031 | 173865 | 3 |
0.032 | 349408 | 2 |
0.033 | 70000 | 1 |
Last trade - 15.59pm 28/07/2025 (20 minute delay) ? |
Featured News
GT1 (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online