If a JV with GAL does eventuate here are some ESTIMATED numbers for that JV.
GSR/CNJ........Co 31,473 tonnes.....Ni 139,880 tonnes.
GAL................Co 14,300 ................Ni 71,000
Total...............Co 45,773.................Ni 210,880
This is metal in the ground for Mt T only, total tonnage mined 39.4m tonnes @ 1.8mt p/a = 22yr mine life.
GAL might include Mission sill and Goblin.
The problem with the PFS plant flowsheet was the poor metal recovery Co 74% and Ni 22%.The MD appears to like the HPAL process, these plants are expensive and not without problems eg Ravensthorpe,Murrin Murrin and Goro. Also is Mt T big enough to justify an HPAL plant?
I think improved metal recovery is the key to Mt T.........AIMO.
- Forums
- ASX - By Stock
- GSR
- Ann: New High-Grade Intercepts at Burbanks
Ann: New High-Grade Intercepts at Burbanks, page-13
Featured News
Add GSR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.10M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GSR (ASX) Chart |
Day chart unavailable