While there is no mention of a starter pit there is a concentration of drilling around TRC001 including infill drilling which suggest to me that will be where the start pit will be. There seems to be a decent amount of near surface ore that can be mined with out compromising the pit design at a latter date.
While try are in a much better financial position they need to build on that and get to the point they have enough cash to cover an unexpected mine or mill problem. With mostly lower grade ore atm, production costs are at the higher end and probably only making just enough profit.
If as I expect try start treating OC ore towards the end of year, investec loan should be paid out by then, trade creditors reduces, high production and lower cost will allow try to build cash reserves.
TRY could be in a position to pay dividends in a years time but what we really need is for try to extent LOM to 10 plus years, IMO that is realistically achievable but still needs a lot of drilling to get to JORC
Add to My Watchlist
What is My Watchlist?