Given the close proximity of Auroch's high grade Leinster Nickel Project to BHP's Leinster nickel concentrator and the Saints / Nepean Nickel Projects being within trucking distance of BHP's Kambalda nickel concentrator then it is conceivable three high grade nickel projects could be developed simultaneously and feed into the BHP Kalgoorlie Nickel Smelter.
In reality, at least one of the nickel projects should be developed by AOU and used as feed stock to the Kalgoorlie nickel smelter to help BHP's ambitions of producing Nickel Sulphates for the expanding EV market.
Below image from Mincor presentation
- Forums
- ASX - By Stock
- FBM
- Ann: NEW HIGH-GRADE NICKEL SULPHIDE DRILL INTERCEPTS AT NEPEAN
Ann: NEW HIGH-GRADE NICKEL SULPHIDE DRILL INTERCEPTS AT NEPEAN, page-57
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBM (ASX) to my watchlist
|
|||||
Last
2.8¢ |
Change
-0.002(6.67%) |
Mkt cap ! $18.54M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 2.8¢ | $45.63K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 37086 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 19000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 37086 | 0.028 |
1 | 30000 | 0.027 |
2 | 238426 | 0.026 |
4 | 394000 | 0.025 |
1 | 41230 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 19000 | 1 |
0.033 | 150000 | 1 |
0.035 | 20000 | 1 |
0.038 | 40000 | 1 |
0.039 | 20000 | 1 |
Last trade - 15.59pm 12/07/2024 (20 minute delay) ? |
Featured News
FBM (ASX) Chart |