These ASX announcements are legal documents ... trying to second guess them makes no sense to me. They should be taken at face value until proven otherwise.
This is a screenshot of the relevant info about Blue Bar
Main points
*Imminent restart
*10,000t @ 1.5g/t from stockpiles. Why wouldn't you truck that to the mill? Cost of transport is covered by the JV, at a 60/40 split it is equal to the current head grade coming from WGP and no mining cost. 10,000t is only 1 1/2 days throughput for the mill.
*pit design is forecasting 2.5g/t delivered to the mill. On a 60/40 that = 1.5g/t for CAI (which possibly works out more favorably due to costs coming out first)
*Prior to the announcement the grade control drilling has been completed. The numbers have substance.
As I pointed out in a post on another thread... this bumps CAI's head grade up to >1g/t which makes a huge difference to the economics. At the current head grade of ~0.9g/t WGP runs at a small operating profit. Everything above that is straight to the bottom line profit.
- Forums
- ASX - By Stock
- CAI
- Ann: New Large High-Grade Satellite Deposits to Feed Warrawoona
Ann: New Large High-Grade Satellite Deposits to Feed Warrawoona, page-55
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online