Certainly it is great to get new contract, but we get up date on capacity increase, it won't flow to bottom line. At this stage, the capacity is 20000 ton per year, they are in the middle of building a new factory, another 45000 ton maybe. Given the demand, is a 3rd factory down the track or additional capital is needed? I see the biggest risk with this company is political risk.
- Forums
- ASX - By Stock
- Ann: New Large Project in Wuhan, China
Certainly it is great to get new contract, but we get up date on...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PET (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.60M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PET (ASX) Chart |
Day chart unavailable