AUC 5.88% 3.6¢ ausgold limited

50%-100% increase in gold resources in the pipeline? Currently...

  1. 4,747 Posts.
    lightbulb Created with Sketch. 1005
    50%-100% increase in gold resources in the pipeline? Currently 1.2M ounces, Jinkas South is a parallel lode to Jinkas and is now at +700m since drilling started on that section. Current drilling is very shallow at 170m. ALL of the lodes remain open both at depth and strike.
 
watchlist Created with Sketch. Add AUC (ASX) to my watchlist
(20min delay)
Last
3.6¢
Change
0.002(5.88%)
Mkt cap ! $99.43M
Open High Low Value Volume
3.5¢ 3.7¢ 3.5¢ $200.1K 5.564M

Buyers (Bids)

No. Vol. Price($)
11 2595633 3.5¢
 

Sellers (Offers)

Price($) Vol. No.
3.6¢ 134916 1
View Market Depth
Last trade - 16.10pm 25/06/2024 (20 minute delay) ?
AUC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.