CPM 5.97% 6.3¢ cooper metals limited

Ann: New rock chip assays expand search area at Brumby Ridge, page-10

  1. 51 Posts.
    lightbulb Created with Sketch. 6
    Drilling other way around. 1000m DD, 2000m RC.
    so maybe 2 x 500m deep holes, the rest more shallow to expand out.
 
watchlist Created with Sketch. Add CPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.