as per the osm blurb they claim to be getting cells as of half way through this year. I wonder if they will start producing a small proportion say in sept or do they require all the equipment ready before they can make?
re: contracts spread out over a few years. read the previous Anns. if they have 60% of capacity being now 1.8gwh, that's a capacity per year - that's what a 1.8 GWh factory produces. c4v have said they have contracts to the capacity of 60% (before the 400-600 ramp up so someone else had signed) the value of the contracts are per today's Ann. obviously it's per year. seriously. you want to downramp this?
- Forums
- ASX - By Stock
- MNS
- Ann: New York Battery Plant Annual Capacity Increased - 1.8GWh
Ann: New York Battery Plant Annual Capacity Increased - 1.8GWh, page-59
-
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable