G'day Hara,
I have a great deal of respect for your posts mate.
Isn't it 250m of DD though, and 1500m of RC drilling, that is about to commence.
Would also like to hear your views about DD at Viper, considering the current spacing of 100 metres and very little infill drilling, ie, is it a bit early for DD ? Do you see anything in results already released which might be driving the need for this DD hole, apart from [email protected] g/t at surface of course.
- Forums
- ASX - By Stock
- Ann: Next Phase Drilling Commenced at Massigui Gold Project
G'day Hara, I have a great deal of respect for your posts mate....
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $236.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
FFX (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online