With Cu spot price below assumption price in Restart Study, I'm sure it's making finance more challenging. That in addition to potential economic headwinds, which would likely put downward prices on metals ('Dr Copper' ), may make financing terms less favourable. Given the cost of diesel and labour, I wonder if it would have been a reasonable option to do the refurb of SX-EW and retreat existing heaps first (17Mt @ 0.5% = 85 kt Cu, 3 yrs production). After 3 years start pre-stripping and get into mining...
- Forums
- ASX - By Stock
- CYM
- Ann: Nifty East Extensional Infill Drilling Results
Ann: Nifty East Extensional Infill Drilling Results, page-27
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.67M |
Open | High | Low | Value | Volume |
2.5¢ | 2.6¢ | 2.5¢ | $8.089K | 311.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 970701 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 182134 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 930701 | 0.025 |
5 | 404633 | 0.024 |
2 | 321884 | 0.023 |
3 | 685000 | 0.022 |
1 | 385000 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 182134 | 2 |
0.027 | 376186 | 4 |
0.028 | 1973231 | 3 |
0.029 | 185653 | 2 |
0.030 | 742433 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |