I'm not sure about that. The restart plan may only be for the existing heap leach stockpile. Crushing, stacking and leaching ore from yet to be mined oxide seems to be outside the scope of what is been suggested so far which is for the SX-EW cathode production using the existing heap leach ore. A plan for the yet to be mined oxide would no doubt involve separate technical study. If I recall correctly, the previous management were already leaching test columns but I don't know how much of that previous work the new management and consultants will rely on.
- Forums
- ASX - By Stock
- Ann: Nifty Surface Mine Scoping Study
I'm not sure about that. The restart plan may only be for the...
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
0.003(10.3%) |
Mkt cap ! $44.25M |
Open | High | Low | Value | Volume |
2.9¢ | 3.2¢ | 2.9¢ | $14.14K | 472.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 333064 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 211331 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 333064 | 0.030 |
4 | 1038773 | 0.029 |
9 | 626676 | 0.028 |
6 | 3341802 | 0.027 |
4 | 733998 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 211331 | 2 |
0.033 | 340000 | 1 |
0.034 | 350000 | 2 |
0.035 | 390620 | 2 |
0.036 | 350000 | 1 |
Last trade - 14.10pm 11/10/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |