HAS hastings technology metals ltd

Ann: Niobium Maiden Mineral Resource, page-4

  1. 1,946 Posts.
    lightbulb Created with Sketch. 1203

    I asked GPT4o to analyse this news:

    Analysis of the Announcement

    1. Overview:Hastings Technology Metals Ltd (HAS) has announced a maiden Niobium Measured and Indicated Mineral Resource at its Yangibana Rare Earth and Niobium Project. The resource is estimated at 6.7 million tonnes with an average grade of 2,305ppm (0.2305%) Nb2O5, which translates to approximately 15,501 tonnes of contained Nb2O5. This resource is located within the Bald Hill and Simon’s Find deposits, which are part of the broader Yangibana project in Western Australia’s Gascoyne region.


    2. Resource Details:

    • Grade: The niobium grade at 2,305ppm is relatively high when compared to other niobium resources globally, particularly considering it is being reported as part of a multi-commodity deposit.
    • Tonnage: Although the resource size of 6.7 million tonnes is not large in the context of global niobium resources, it is significant when considering it is a by-product within the context of a rare earth project.
    • Geological Context: The niobium is hosted in ferrocolumbite within a carbonatite-related mineral system. This type of mineralization is typical of other large niobium deposits, such as Araxá in Brazil, though on a smaller scale.
    • Development Potential: The resource is located within the existing Yangibana project area, which has a planned processing plant. This proximity to infrastructure should lower the additional capital expenditure required to bring the niobium into production.


    3. Comparison to Peers:

    • Araxa Mine, Brazil (CBMM): The world's largest niobium producer, with grades typically around 2.5% Nb2O5. While the grade is higher at Araxa, the scale is also vastly larger, making Yangibana’s niobium a much smaller operation in comparison.

    • Catalão Mine, Brazil (CMOC International): Another major niobium mine with grades in the range of 1.0-2.5% Nb2O5. Yangibana’s grades are competitive with the lower end of Catalão’s grades, but again, the scale is much smaller.

    • WA1 Resources - Luni Project: Recent announcements from WA1 have shown niobium grades in the range of 1,400-2,000 ppm Nb2O5. Yangibana’s grade of 2,305 ppm is on the higher end of this range, making it attractive in terms of grade, although the resource size is smaller.


    4. Economic Viability:

    • Grade Consideration: With niobium typically selling at a high price per kilogram (around $40-50/kg Nb2O5), the grade at Yangibana (2,305ppm) is quite favorable for generating significant revenue from a by-product. However, the economic viability will depend heavily on recovery rates and processing costs.

    • Processing and Recovery: The announcement mentions that niobium can be recovered using existing beneficiation processes, with some modifications. This is a positive indicator as it suggests that the niobium can be extracted without significant additional capital costs, enhancing the project's overall economics.

    • Market Context: Niobium is a critical metal with major uses in the production of high-strength steel, superalloys, and as a component in advanced technologies like lithium-ion batteries. The market is dominated by Brazil, but with supply chains seeking diversification, a new source from Australia could attract interest, particularly if geopolitical risks increase.

    • By-Product Potential: The fact that niobium is a by-product at Yangibana adds significant upside potential. The project’s economics are primarily driven by rare earth elements, particularly NdPr, which are critical for magnets in electric vehicles and wind turbines. The addition of niobium could improve the overall profitability of the project.


    5. Risks and Considerations:

    • Scale: The relatively small size of the niobium resource could limit its impact on the overall project economics. While the grades are good, the volume may not be sufficient to position Hastings as a major player in the niobium market.

    • Market Competition: Competing with established giants like CBMM in Brazil could be challenging, especially if Hastings aims to market its niobium independently. However, the company may also find niche markets or specific customers interested in a diversified supply.

    • Metallurgical Challenges: Although the initial test work is promising, there remains a risk that metallurgical recovery could be lower than expected, which would impact the economic return from the niobium.


    Conclusion

    The announcement from Hastings Technology Metals Ltd regarding the maiden niobium resource at Yangibana is indeed positive. The grade of 2,305 ppm is competitive within the niobium sector, especially for a project where niobium is a by-product. While the resource is smaller in scale compared to global niobium leaders, it adds valuable diversity to the Yangibana project’s revenue stream.

    The key to unlocking the economic potential of this resource will be efficient recovery and integration into the existing rare earth processing flowsheet. If Hastings can achieve good recovery rates without significant additional costs, the niobium could enhance the overall project economics, making Yangibana a more attractive asset in a critical minerals market. However, the scale of the resource and competition from larger, more established niobium producers remain factors that could temper the market impact of this discovery.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
27.0¢
Change
-0.015(5.26%)
Mkt cap ! $50.99M
Open High Low Value Volume
28.5¢ 28.5¢ 27.0¢ $100.6K 362.4K

Buyers (Bids)

No. Vol. Price($)
7 52013 27.0¢
 

Sellers (Offers)

Price($) Vol. No.
27.5¢ 9472 3
View Market Depth
Last trade - 14.32pm 18/06/2025 (20 minute delay) ?
HAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.