I think you ahould email RC and explain to him why he should spend another 1/3 extra project cost so you can have the wellsite buried haha..
All interconnecting water gathering and gas gathering pipes will be buried. At the wellsites/well-adjusted the infrastructure is exposed for maintenance and ease of access/decommissioning.
The pipework has flanges. The valves have flanges. The flow meters and instruments have flanges. You dont bury that equipment. Do you want the seperators buried as well?
- Forums
- ASX - By Stock
- Ann: Nomgon Pilot Flows Gas
I think you ahould email RC and explain to him why he should...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
0.002(2.99%) |
Mkt cap ! $82.57M |
Open | High | Low | Value | Volume |
6.8¢ | 7.1¢ | 6.6¢ | $544.4K | 7.993M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 277340 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 25510 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 327440 | 0.068 |
10 | 532787 | 0.067 |
7 | 630000 | 0.066 |
14 | 503537 | 0.065 |
4 | 462000 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 462513 | 4 |
0.071 | 617212 | 7 |
0.072 | 152715 | 3 |
0.073 | 521000 | 3 |
0.074 | 416326 | 5 |
Last trade - 13.54pm 11/10/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |