EXR 0.00% 15.0¢ elixir energy limited

I reckon the feasibility study will happen quicker than that -...

  1. 97 Posts.
    lightbulb Created with Sketch. 124
    I reckon the feasibility study will happen quicker than that - as will construction. It will depend entirely on where the engineering and construction is sourced. Remember China build entire cities in months! Probably almost buy a turnkey, CSG fired power plant off the shelf from China these days with minimal logistics cost. My tip - early 2023 for an operational power plant. This company is so switched on. The strategic timing for announcements is carefully factored just like the incremental Contingent Resources announcements. $1.00 party this year !!!
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
15.0¢
Change
0.000(0.00%)
Mkt cap ! $179.5M
Open High Low Value Volume
15.5¢ 15.8¢ 15.0¢ $464.2K 3.044M

Buyers (Bids)

No. Vol. Price($)
8 350583 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 220882 4
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.