DFS is said to be released in Q1 this year. The hydroxide plant is part of the DFS.
Say hypothetically if the MOU was genuine, this MOU must be finalised within 2 months before DFS could be released in this Q1.
- Forums
- ASX - By Stock
- EUR
- Ann: Non-binding MOU executed to build & operate hydroxide plant
Ann: Non-binding MOU executed to build & operate hydroxide plant, page-101
-
- There are more pages in this discussion • 121 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $51.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EUR (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online