I don't have a problem with a Hxdroxide plant being built in Saudi Arabia because, as already mentioned, the energy costs there are very very low.....I'm just saying that the possibility is dwindling that the mine will then also be opened and the lithium, as already mentioned here by some, will probably come from somewhere else...but probably not from Austria.
From minute 8:20
https://www.youtube.com/watch?v=XCkBOVG_rm0
There are offers from leading battery manufacturers in Europe and to sell concentrate to companies in China. The Austrian government does not want the company to sell cheaper concentrate to China and have to re-import it later. The government wants a high quality product to be sold directly to battery manufacturers in Europe.
- Forums
- ASX - By Stock
- EUR
- Ann: Non-binding MOU executed to build & operate hydroxide plant
Ann: Non-binding MOU executed to build & operate hydroxide plant, page-112
-
-
- There are more pages in this discussion • 110 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
|
|||||
Last
5.1¢ |
Change
-0.002(3.77%) |
Mkt cap ! $71.30M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.0¢ | $64.30K | 1.272M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 129955 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 12345 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 129955 | 0.050 |
4 | 164080 | 0.049 |
4 | 206689 | 0.048 |
3 | 142430 | 0.047 |
4 | 88829 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 12345 | 1 |
0.053 | 87000 | 1 |
0.054 | 30000 | 1 |
0.055 | 23149 | 2 |
0.056 | 69230 | 3 |
Last trade - 15.58pm 17/07/2024 (20 minute delay) ? |
Featured News
EUR (ASX) Chart |