I wonder if the current DFS includes the plant estimated costs been built in Austria or Saudi Arabia?
Fairly sure at this stage Austria....and the high Capex would indicate this.
Maybe he can retain the high project NPV while bringing product price down, by cheaper plant capex in SA??
If he manages this... then I can see CMC should fly on listing....
Not even going to entertain the possibility of a plant in SA been able to process other mines ore also.....
- Forums
- ASX - By Stock
- EUR
- Ann: Non-binding MOU executed to build & operate hydroxide plant
Ann: Non-binding MOU executed to build & operate hydroxide plant, page-34
-
-
- There are more pages in this discussion • 188 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $74.10M |
Open | High | Low | Value | Volume |
5.4¢ | 5.5¢ | 5.2¢ | $25.94K | 488.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 91238 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.3¢ | 19769 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 91238 | 0.052 |
1 | 2500 | 0.051 |
8 | 141095 | 0.050 |
3 | 143652 | 0.049 |
2 | 41689 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.053 | 19769 | 2 |
0.055 | 3149 | 1 |
0.056 | 19367 | 2 |
0.057 | 210133 | 6 |
0.058 | 400000 | 2 |
Last trade - 16.10pm 16/07/2024 (20 minute delay) ? |
Featured News
EUR (ASX) Chart |